22467589_1716855701660901_7583080693855406968_o.jpg

Come on down and join us on Wednesday 25th and Saturday 28th October for the grand opening of the Kwinana Marketplace Re-Development, including a new state-of-the-art Coles Supermarket and variety of exciting retail stores.


_________________________________________________________

**EVENT SCHEDULE**
Wednesday 25 October 2017

8AM TO 8.30AM
The first 250 people to arrive at 8am will receive a FREE goodie bag *Limit of one bag per person, per family.

Official opening ceremony speeches and cutting of the ribbon.

At 8.30am the winner of our 5 Day Malaysian Holiday prize for 2 adults & 2 children (along with tickets to Legoland) will be drawn. The winner must be present at the draw to claim the prize.

For details of how to enter head to our WIN page.

9.30AM TO 5.00PM

Peppa Pig Meet and Greet // 9.30am – 12.30pm
Seniors Retro Bingo // 10am – 12:00pm
Bricks for Kidz Workshop // 10:00am - 1.00pm
Kids Storytime with Karrak // 10.30am – 12.30pm
Josephine & Goggles LIVE Show // 12:00pm & 4:00pm
Goggles Meet and Greet // 2.00pm – 2.20pm
Lego Ninjago: Lloyd Meet & Greet // 2.00pm – 5.00pm


___________________________________________________________

**EVENT SCHEDULE**
Saturday 28 October 2017


9.30AM TO 5.00PM

Peppa Pig Meet and Greet // 9.30am – 12.30pm
Bricks for Kidz Workshop // 10:00am - 1:00pm
Josephine & Goggles LIVE Show // 12:00pm & 4:00pm
Goggles Meet and Greet // 2.00pm – 2.20pm
Lego Ninjago: Lloyd Meet & Greet // 12pm - 3pm

grand opening.JPG

 

re-development WEEKLY UPDATEs

Monday 15th to Sunday 21st May 2017

Works to be undertaken this week:

COLES

  • ·       Staff Area / back of house fitout.
  • ·       Services installation BOH
  • ·       Installation of Cool room panel wall back of house
  • ·       Trading floor Cool rooms
  • ·       Trading Floor Services
  • ·       Loading dock concrete pours
  • ·       Plant room fitout
  • ·       External Painting
  • ·       Syphonic Drainage  
  • ·       Trim subgrade
  • ·       Trading Floor Concrete Pours
  • ·       Tilt Panel Install   

BEST & LESS  

  • ·       Trim Subgrade
  • ·       Fire Corridor Pour
  • ·       Back of house Pour
  • ·       Back of house Wall
  • ·       Roof Install

MALL AREA  

  • ·       Liquorland Fitout

EXTERNAL 

  • ·       Stormwater / Services in Laneway  
  • ·       Civil works – Western Boundary

NOTE: Noise levels over the next few months will increase in Centre due to development works nearing closer to the Coles hoarding. We appreciate your patience whilst these works are undertaken.


Monday 8th May - Sunday 14th May

COLES

  • Staff Area / back of house  fit out.

  • Services installation back of house

  • Installation of Cool room panel wall back of house

  • Trading floor Coolrooms

  • Trading Floor Services

  • Loading dock concrete pours

  • Plant room fitout

  • External Painting

  • Trim subgrade

  • Trading Floor Concrete Pours

BEST & LESS

  • In ground services for new BOH

  • Fire Corridor Pour

MALL AREA

  • Mall Roofing

  • Concrete infill pours to service trenches

  • High Level Services to Liquorland

  • Coolroom construction

  • Liquorland Tenancy Wall construction

cEXTERNAL

  • Stormwater / Services in Laneway  


Monday 1st May - Sunday 7th May

Works to be undertaken this week:

COLES T-Q

·       Staff Area / Back of house fit out.

·       Services installation Back of house

·       Installation of Cool room panel wall Back of house

·       Trading floor Cool rooms

·       Trading Floor Services

·       Loading dock concrete pours

·       Plant room fit out

·       External Painting

COLES DELAYED Q-B

·       Roof Sheeting - Trading floor

·       Trim subgrade

BEST & LESS

·       Gas & Water Rough in

·       In ground services for new Back of house

MALL AREA

·       Structural Steel Rafter Installation

·       Liquor Land concrete pour

EXTERNAL

·       Stormwater / Services in Laneway  

NOTE: Noise levels over the next few months will increase in Centre due to development works nearing closer to the Coles hoarding. We appreciate your patience whilst these works are undertaken.

aa.jpg

Monday 10th to Sunday 16th April 2017

Works to be undertaken this week:

COLES T-Q

Structural steel trading floor // Roof sheeting trading floor // Staff area / BOH commence fitout // Services installation BOH // Painting of structural steel // Installation of coolroom panel wall BOH // Positioning of refrigeration rack in plantroom // Stormwater in laneway

COLES DELAYED Q-B

Casting tilt panels // Footings // Lift tilt panels // Structural steel

MALL AREA

Services works high level // Demolition works // Structural steel truss works installation

EXTERNAL

Shade sail footing to commence (night works) // Grease trap installation in laneway // Syphonic inground services in laneway // Stormwater in laneway // Laneway remediation services underway

NOTE: Noise levels over the next few months will increase in Centre due to development works nearing closer to the Coles hoarding. We appreciate your patience whilst these works are undertaken.


Monday 3rd to Sunday 9th April 2017

Works to be undertaken this week:

COLES T-Q

Structural steel - trading floor // Roofing – box gutters // Roof sheeting – plant room // Roof sheeting – trading floor // Staff Area / BOH commence fitout // Installation of coolroom panel wall BOH // Positioning of refrigeration rack in plantroom // Grease trap installation in laneway // Syphonic in ground services in laneway // Stormwater in laneway

COLES DELAYED Q-B

Demolition of Best & Less // Removal of Best & Less Tilt Panels // Casting Tilt Panels // Footings

MALL AREA

Services works high level // Structural steel truss works installation // Removal of existing terrazzo // Install Coles hoarding decal

EXTERNAL

Shade sail footing installation to commence (Night works)

NOTE: Noise levels over the next few months will increase in Centre due to development works nearing closer to the Coles hoarding. We appreciate your patience whilst these works are undertaken.

dev.JPG

Monday 27th March to Sunday 2nd April 2017

Works to be undertaken this week:

COLES T-Q

Structural steel to plantroom // Valve room construction // Relocation of main fire services // Structural steel trading floor // Roofing – box gutters // Grease trap installation in laneway // Syphonic in ground services in laneway // Stormwater in laneway

COLES DELAYED Q-B

Demolition of Best & Less // Removal of Best & Less Tilt Panels // Casting Tilt Panels  Footings

dev.JPG

Monday 20th to Sunday 26th March 2017

Works to be undertaken this week:

COLES T-Q

Structural Steel to Plantroom // Concrete Pour Mezzanine Slab // Valve Room Construction // Relocation of Main fire services // Structural Steel Trading Floor // Grease Trap Installation in Laneway

COLES DELAYED Q-B

Demolition of Best and Less


Monday 13th to Sunday 19th March 2017

Works to be undertaken this week:

COLES T-Q

BOH Infill Concrete Pour // Loading Dock Concrete Pour // Structural Steel to Plantroom // Concrete Pour Mezzanine Slab // Relocation of Main fire services commencement // Re diversion of stormwater // Structural Steel Trading Floor

COLES DELAYED Q-B

Removal of redundant services within Best and Less // Demolition of Best and Less


Monday 6th to Sunday 12th March 2017

Works to be undertaken this week:

COLES T-Q

Pour Trading Floor Slabs // BOH Infill Concrete Pours // Loading Dock Concrete Pours // Structural Steel to Plantroom // Mezzanine Slab Formwork // Relocation of Main fire services commencement // Re diversion of stormwater // Structural Steel Trading Floor.

COLES DELAYED Q-B

Removal of redundant services within Best and Less // Demolition of Best and Less.

redevelop.JPG

Monday 20th February to Sunday 26th February 2017

Works to be undertaken this week:

COLES

Installation of in ground services to Coles building // Commence Pouring Trading Floor Slabs // Concrete Pours to Loading Dock // Continuation of Demolition to Mall Areas // Structural Steel to Plantroom // Service trenches to lane way // Relocation of Main fire services commencement // Installation of Tilt Panels

**COMMENCE TUESDAY, 21st DUE TO WET WEATHER DELAYS** CARPARK NEAR MCDONALDS IMPACTED

Tilt panel lifting will take place Tuesday, 21st February 2017 from 5am.

The exclusion zone for the crane is marked up in red in relation to the development site fence which is blue. Perkins staff will be inside the exclusion zone to ensure no unauthorised access by the public during lifting.

snippet3.JPG

BEST & LESS

Best & Less - Hoarding 1 Area:

Install POS Counter // Install bi fold door // Fit off ceiling services // Fit off Fitting Rooms // Switchboard works for handover

Best & Less - Hoarding 2 Area:  

Set & Paint Tenancy Wall // Fit off Electrical Services // Fit off Hydrolic services

**LANEWAY SHUT DOWN REQUIRED 20TH FEBRUARY 2017 – 7AM UNTIL 12PM MIDDAY**

Perkins is required to trench across laneway for development services. Plan below highlights the area for laneway works along with those retailers who will be impacted.


Monday 13th February to Sunday 19th February 2017

Works to be undertaken this week:

COLES

Installation of in ground services to Coles building //  Installation of in ground refrigeration to Coles building // Continuation of Cool room Slabs // Concrete Pours for Coles Prep Areas and BOH Slabs // FRP Columns to Coles Mezzanine Slab // Casting of Tilt Panels to Coles Building // Continuation of Demolition to Mall Areas and redundant Liquorland stockroom.

Installation of Tilt Panels **COMMENCE MONDAY, 20TH DUE TO WET WEATHER DELAYS.  CARPARK NEAR MCDONALDS IMPACTED**  Tilt panel lifting will take place Monday, 20th February 2017 from 5am.

The exclusion zone for the crane is marked up in red in relation to the development site fence which is blue. Perkins staff will be inside the exclusion zone to ensure no unauthorised access by the public during lifting.

BEST & LESS
 
Best & Less - Hoarding 1 Area:  
 
Services works // Floor preparation // Installation of ceiling and bulkheads // Glazing to shop front // Install POS Counter // Install lease line signage // Install bi fold door // Fit off ceiling services // Paint ceiling.
 
Best & Less - Hoarding 2 Area: 
 
Define temp BOH internal walls Rough in electrical services // Rough in hydraulic services.  **LANEWAY SHUT DOWN REQUIRED 20TH FEBRUARY 2017 – 7AM UNTIL 12PM MIDDAY** 
 


Monday 6th February to Sunday 12th February 2017

Works to be undertaken this week:

COLES

Installation of in ground services to Coles building // Installation of in ground refrigeration to Coles building // Continuation of Cool room Slabs // Concrete Pours for Coles Prep Areas and BOH Slabs //  Casting of Tilt Panels to Coles Building //  Continuation of Demolition to Mall Areas and redundant Liquorland stockroom. 


BEST & LESS

Best & Less - Hoarding 1 Area: 
Services works // Floor Preparation // Chasing of services through floor // Installation of ceiling and bulkheads // Installation of Shopfront Plywood carcass ready for glazing // Installation of Bi Fold Door Cupboard // Structure works in ceiling for bi fold door and lease line signage // Install bi fold door // Fit off ceiling services // Paint ceiling.


Best & Less - Hoarding 2 Area:

Demolition of blockwork tenancy wall // Define temp BOH internal walls // Rough in Electrical Services (NIGHTS WORKS - MONDAY TO FRIDAY) // Rough in hydraulic services


FIRE CORRIDOR
Minor touch up works to New Fire Passage corridor


Monday 30th January to Sunday 5th February

Works to be undertaken this week:

Installation of in ground services & refrigeration to Coles building // High level services to Best & Less Stage 1 area // Continuation of cool room slabs // Commence concrete pours for Coles prep areas // Completion of new fire passage corridor Tuesday, 31 January 2017 // Hoarding alterations within mall to Nextra to accommodate fire corridor handover // Demolition of redundant fire corridor // Casting of tilt panels to Coles building // Continuation of demolition to mall areas and redundant Liquorland stockroom //  Installation of Hoarding to Best& less Stage 2 // Commence Best & Less Fitout including back of house and office fitout. 

kwin1.JPG

Monday 23rd January to Sunday 29th January 2017

Works to be undertaken this week: - Installation of inground services to Coles building - Installation of inground refrigeration to Coles building - High Level Services to Best and Less Stage 1 Area - Construction of New Fire Passage corridor - Casting of Tilt Panels to Coles Building - Re-commence demolition to Mall Areas and redundant Liquorland stockroom. 


Monday 16th to Sunday 22nd January 2017

Works to be undertaken this week: - Installation of in ground services to Coles building - Installation of in ground refrigeration to Coles building - Pad Footings to Coles Building - High Level Services to Best and Less Stage 1 Area - Construction of New Fire Passage corridor - Casting of Tilt Panels to Coles Building - Installation of Major Mall Hoarding between old Go Sushi tenancy and Best and Less


Monday 19th to Thursday 22nd December 2016

Works to be undertaken this week - Installation of in-ground services to Coles building // Pad Footings to Coles Building // Core fill and backfilling blockwork retaining walls to loading dock area // Continuation of in-ground Stormwater Cell System // Ongoing demolition and strip out of Nextra area in preparation of Best & Less expansion and new Fire Passage works // Site clean-up and secure site for Christmas shutdown // Line marking and associated works for new Liquorland delivery bays and relocation of Taxi Bays.

The Development site will be shutdown from 3pm Thursday, 22 December 2016 and reopened Wednesday, 4 January 2017.


Monday 12th to Sunday 18th December 2016

Works to be undertaken this week: - Installation of inground services to Coles building - Pad Footings to Coles Building - Commencement of blockwork retaining walls to loading dock area. - Liquorland security works. - Commencement of Inground Stormwater Cell System. - Mall Hoarding Installation to Nextra. - Demolition and strip out of Nextra area where downsized in preparation of Best & Less and new Fire Passage works. 


Monday 5th to Sunday 11th December 2016

Works to be undertaken this week: - Installation of inground services to Coles building - Preparation of building pad - Complete Screw pile foundation works to new Coles building - Preparation of reinforcement cages for building footings - Concrete pour to loading dock footings - Commencement of blockwork retaining walls to loading dock area - Liquorland security works.